Rye Y Annual Maintenance Period

August 16-September 11, 2026
Date and Time
maintenance
Share

During this time various areas of the building will be CLOSED for repairs, painting, and cleaning. The tentative schedule is as follows:

  • Painting and duct cleaning will take place throughout the facility during the maintenance period.
  • The Pa Cope pool (4-lane) will be closed August 15 at 3pm (after swim classes) through August 25, reopening on August 26. The Brookside pool (6 lane) will be available.
  • The Brookside Pool (6-lane) will be closed August 26 through September 8, reopening on September 9. The Pa Cope Pool (4- lane) will be available during that timeframe. We anticipate that both pools will be open beginning September 9. Please make note there may be changes to the maintenance schedule and we will post on our app accordingly.
  • The Gymnasium will be closed from August 17 through 
    August 29 for repairs & floor refinishing.
  • The Y Studios will be closed August 18 for painting.
  • The Main Fitness Center will be closed from 6:00pm on August 15 through August 25 for flooring installation and deep cleaning. The Extended Fitness Area and Performance Studio will remain open with additional fitness equipment until August 22.  All Fitness areas will re-open on August 26.
  • The Parking Lot will have limited parking on September 5, 6 & 7 due to seal coating and re-striping.
Contact for more information
Rye YMCA
The Studios at the Rye YMCA (Y Studios)