Maintenance Period
Our annual maintenance period is August 18-September 5. During this period various areas of our facility will be closed for repairs, painting and cleaning. Highlights:
- The Pa Cope pool (4-lane) will be closed August 19 (after swim lessons) through August 27.
- The Fitness Center will be closed on August 24 .
- The Brookside Pool (6-lane) will be closed August 28 through September 5.
- The Y Studios will be closed August 31.
View the schedule of other maintenance.